A meeting of the Stony Creek Association Executive Board was called to order by President Peter Brainerd at Willoughby Wallace Memorial Library at 7:35 p.m. on Tuesday, October 5, 2004.

Present: Peter Brainerd, President, Gregory Ames, Treasurer, Jake Greenvall, Tax Collector, Sandy Fischer, Dottie Leachman, Ron DeFord, Berclee Cameron, Bob Babcock, Dan Bullard, Stan Fisher, Michael Infantino, Nina Smith, Clerk

Absent: Marvin Zimmerman, Vice-President

Public: 1

Minutes: A motion was made/seconded and unanimously approved to accept the minutes of the September 7, 2004 meeting with the following change: name under police and traffic is Tom Patton.

Treasurer’s Report: A copy of the Treasurer’s report was distributed:
General Fund
Total cash on hand 9-1-04 $6,021.50
Total income: int. on checking account 1.23
Deposit-tax receipts 5,364.79
Youth group refund 104.00
Bills approved for pay. Sept. 7, 2004 (422.92)

Bank Fees .00
Total cash on hand 10-1-04 $11,068.60 (General Fund $10,958.60, Ramshaw Memorial Fund $110.00.) .
Savings
Cash on hand 9-1-04 $18,542.11
Int. Sav acc’t 9-30-04 52.18

Cash on Hand-Savings 10-1-04 $18,594.29

Total Savings: $18,594.29 (General Fund $9,124.54, Sidewalks $5,730.50, Summer House $3,100.06, Open Space $639.19).

A motion was made/seconded and unanimously approved to file the Treasurer’s report for audit.

Bills: Motions were made/seconded and unanimously approved to pay the following bills:

Date: October 1, 2004


CL&P
for: Lighting & Electricity (Sept.7 invoice) $24.54


To: Susan M. Torre $68.72
For: Secretarial remuneration Aug. $60.00
Duplicating $3.54 Stamps $5.18

To: Shore Line Newspapers $13.85
For: Tag. Sale Ad

To: Spin Electric Co., Inc.
For: Repair flag pole light $150.00

To: Richard Atkinson
For: Fabrication of Cornerstones $1,000.00

Total: $1,257.11

Tax Collector: Taxes are being paid, about 90% already paid.

Legal & Zoning: Withdrew request for a variance on Sachem Rd.

Police & Traffic: The signs, yield to pedestrian, have been effective. Will we be buying more signs? The two signs can be moved to other areas, and set up before the cross-walks. Should the sidewalks be repaired before winter?

Maintenance:
1. Jancie from Public Works feels that lead abatement is necessary for the Summer House.
2. Sidewalk survey: there are approximately 25 blocks to be replaced. From the top of Thimble Isl. Rd. to lower part of Thimble Isl. Rd. and top of School Street.
3. Dock area: problem with right of way for electricity, making sure no more excavation is necessary, paving won’t happen until spring.
4. Benches: no prices yet.
5. Post Office drain: Ed is pricing this job.
6. Sidewalk on upper Thimble Isl. Rd.: CL&P making sure they can move poles and town has enough room for sidewalks.

Administration: Ad was placed in the newspapers for bids for snow plowing.

Old Business: Flag pole work completed.
Specifications for the New Park Toilets were revised and booklets handed out. Looking over the site plans, floor plan and estimated costs a question was asked as to the size of the toilets. Could the storage area be reduced and the facilities be enlarged for more than one toilet? A great job was done, giving all the specifics for this project. A motion was made/seconded and unanimously approved to proceed applying for grants and to go forward with this project.

New Business: None

Other Business: None
A motion was made/seconded and unanimously approved to adjourn the meeting at 9:15 P.M.

Respectfully submitted,


Susan M. Torre
Secretary

The next meeting of the Stony Creek Association Executive Board will be held on Tuesday, November 2, 2004 at 7:30 p.m. at the Willoughby Wallace Memorial Library.